Retail pharmacy giant consolidates IT for agility and resilience on Hitachi HCI solutions.
Modernize your apps and infrastructure with VMware Tanzu on Hitachi HCI to increase business agility and deliver operational consistency across on-premises and public clouds. Flexible hybrid cloud solution for today and tomorrow.
Flexibility to run the app on the most optimal infrastructure with seamless workload mobility across platforms.
READ ANALYST WHITE PAPERDeliver consistent high-performance to support critical apps including SAP HANA and improve resource utilization.
READ ANALYST WHITE PAPERFlexible resource consumption so you simply pay for how much you need, as you need it, when you need it.
REVIEW HCI CHECKLISTModernize your data center and accelerate your cloud transformation with integrated hyperconverged solutions.
Faster time to production so you focus more on innovation not on infrastructure.
Faster time to production with Day 0-2 automation of manual steps.
Maximize your storage investments with a seamless workload mobility between HCI and SAN.
Non-disruptive upgrades across the HCI stack including networking switches.
Native and optimized data protection to ensure continuous operations.
Single point of support for full-stack HCI including hardware, software and virtualization.
Configuration | All-NVMe flash (Intel Select Solutions* verified) |
Form Factor | 1 unit (U), 1 node |
Processor |
Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W) Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W) Intel Xeon Platinum 8276L (28 cores, 2.20 GHz, 165W) |
Raw Storage, per Node | 3-80TB |
Estimated Usable Capacity | 5-210TB |
Memory (traditional DIMMs, DDR4) | Up to 3.0TB per node |
Memory, (Intel Optane DC Persistent Memory | 6TB (12 x 512GB) DCPMM with up to 1.5TB (12 x 128GB) DDR4 Cache |
Cache tier | Intel Optane SSD DC P4600 (1.6TB) or P4800X 375GB or 750GB |
Network |
Up to 4 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Arista, Cisco Nexus or any other switch that meets VMware vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
Configuration | All-flash, general purpose (GP) GPU-enabled |
Form Factor | 2U, 1 node |
Processor |
Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) Intel Xeon Gold 6256 (12 cores, 3.60 GHz, 205W) Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W) Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W) Intel Xeon Gold 6242R (20 cores, 3.10 GHz, 205W) Intel Xeon Gold 6248R (24 cores, 3.00 GHz, 205W) Or |
Raw Storage, per Node | 4-47TB |
Estimated Usable Capacity | 6-124TB |
Memory (traditional DIMMs, DDR4) | Up to 1.5TB per node |
Memory, (Intel Optane DC Persistent Memory | N/A |
Cache tier | 1x or 2x Intel : Intel SSD DC S4600 960GB |
Network |
Up to 4 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Cisco Nexus or any other switch that meets vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2,000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
Configuration | All-flash |
Form Factor | 2U, 1 node |
Processor |
Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) Intel Xeon Gold 6256 (12 cores, 3.60 GHz, 205W) Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W) Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W) Intel Xeon Gold 6242R (20 cores, 3.10 GHz, 205W) Intel Xeon Gold 6248R (24 cores, 3.00 GHz, 205W) |
Raw Storage, per Node | 2-193TB |
Estimated Usable Capacity | 204-328TB |
Memory (traditional DIMMs, DDR4) | Up to 3.0TB per node |
Memory, (Intel Optane DC Persistent Memory | 6TB (12 x 512GB) DCPMM with up to 1.5TB (12 x 128GB) DDR4 Cache |
Cache tier | Up to 8TB Intel SSD DC P4600 (NVMe) or up to 3.75GB Intel Optane SSD DC P4800X |
Network |
Up to 4 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Cisco Nexus or any other switch that meets vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2,000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
Configuration | All-flash (Intel Select Solutions* verified) |
Form Factor | 1U, 1 node |
Processor |
Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W) Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W) Intel Xeon Platinum 8276L (28 cores, 2.20 GHz, 165W) |
Raw Storage, per Node | 4-77TB |
Estimated Usable Capacity | 7-200TB |
Memory (traditional DIMMs, DDR4) | Up to 3.0TB per node |
Memory, (Intel Optane DC Persistent Memory | 6TB (12 x 512GB) DCPMM with up to 1.5TB (12 x 128GB) DDR4 Cache |
Cache tier |
Intel Optane SSD DC P4800X Series (375 or 750GB, 2.5 in.,. U.2) or 800Gb - 1.6TB NVMe SSD |
Network |
Up to 4 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Cisco Nexus or any other switch that meets vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2,000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
Configuration | Hybrid |
Form Factor | 1U, 1 node |
Processor |
Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W) Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W) Intel Xeon Platinum 8276L (28 cores, 2.20 GHz, 165W) |
Raw Storage, per Node | 2-18TB |
Estimated Usable Capacity | 1-9TB |
Memory (traditional DIMMs, DDR4) | Up to 3.0TB per node |
Memory, (Intel Optane DC Persistent Memory | 6TB (12 x 512GB) DCPMM with up to 1.5TB (12 x 128GB) DDR4 Cache |
Cache tier | 1-2 x 960GB |
Network |
Up to 4 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Cisco Nexus or any other switch that meets vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2,000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
Configuration | Hybrid |
Form Factor | 2U, 1 node |
Processor |
Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) Intel Xeon Gold 6256 (12 cores, 3.60 GHz, 205W) Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W) Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W) Intel Xeon Gold 6242R (20 cores, 3.10 GHz, 205W) Intel Xeon Gold 6248R (24 cores, 3.00 GHz, 205W) |
Raw Storage, per Node | 12-64TB |
Estimated Usable Capacity | 6-32TB |
Memory (traditional DIMMs, DDR4) | Up to 3TB per node |
Memory, (Intel Optane DC Persistent Memory | 6TB (12 x 512GB) DCPMM with up to 1.5TB (12 x 128GB) DDR4 Cache |
Cache tier | 480GB SATA SSD (1x to 4x) or 960GB SATA SSD (1x to 4x) |
Network |
Up to 4 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Cisco Nexus or any other switch that meets vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
Configuration | All-NVMe flash SFF form factor |
Form Factor | 1 unit, 1 node |
Processor |
Intel Xeon Silver 4310 (12c, 2.1GHz, 120W) Intel Xeon Gold 5320 (26C, 2.2GHz, 185W) Intel Xeon Gold 6342 (24C, 2.8GHz, 230W) Intel Xeon Gold 6348 (28C, 2.6GHz, 235W) Intel Xeon Gold 6338 (32C, 2.0GHz, 205W) Intel Xeon Platinum 8368 (38C, 2.4GHz, 270W) |
Raw Storage, per Node | 0.96TB - 76.8 TB |
Estimated Usable Capacity | 2.52TB - 202TB |
Memory (traditional DIMMs, DDR4) | Up to 4.0 TB per node |
Memory, (Intel Optane DC Persistent Memory |
2TB (16 x 128G) DCPMM with up to 2TB (16 x 128G) DDR4 Cache |
Cache tier | Intel Optane SSD P5800 (800GB) |
Network |
Up to 8 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 4 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X6 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Arista, Cisco Nexus or any other switch that meets VMware vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
Configuration | SSD flash SFF form factor |
Form Factor | 1 unit, 1 node |
Processor |
Intel Xeon Silver 4310 (12c, 2.1GHz, 120W) Intel Xeon Gold 5320 (26C, 2.2GHz, 185W) Intel Xeon Gold 6342 (24C, 2.8GHz, 230W) Intel Xeon Gold 6348 (28C, 2.6GHz, 235W) Intel Xeon Gold 6338 (32C, 2.0GHz, 205W) Intel Xeon Platinum 8368 (38C, 2.4GHz, 270W) |
Raw Storage, per Node | 0.96TB - 76.8 TB |
Estimated Usable Capacity | 2.52TB - 202TB |
Memory (traditional DIMMs, DDR4) | Up to 4.0 TB per node |
Memory, (Intel Optane DC Persistent Memory | 2TB (16 x 128G) DCPMM with up to 2TB (16 x 128G) DDR4 Cache |
Cache tier | Intel Optane SSD P4610 (1.6 TB) |
Network |
Up to 8 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 4 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X6 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Arista, Cisco Nexus or any other switch that meets VMware vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
Configuration | All-NVMe |
Form Factor | 2U, 1 node |
Processor |
Intel Xeon Silver 4310 (12c, 2.1GHz, 120W) Intel Xeon Gold 5320 (26C, 2.2GHz, 185W) Intel Xeon Gold 6342 (24C, 2.8GHz, 230W) Intel Xeon Gold 6348 (28C, 2.6GHz, 235W) Intel Xeon Gold 6338 (32C, 2.0GHz, 205W) Intel Xeon Platinum 8368 (38C, 2.4GHz, 270W) |
Raw Storage, per Node | 2TB - 120TB |
Estimated Usable Capacity | 5.26TB – 315.6TB |
Memory (traditional DIMMs, DDR4) | Up to 4.0 TB per node |
Memory, (Intel Optane DC Persistent Memory | 2TB (16 x 128G) DCPMM with up to 2TB (16 x 128G) DDR4 Cache |
Cache tier | Intel Optane SSD P5800 (800GB) |
Network |
Up to 8 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 4 x 25GbE 2 x 100/50/40/25 GbE port Mellanox Connect X6 EN dual port |
Management Network | One 1Gb/s BMC port |
Network Switch Support | Customer supplied switch such as Arista, Cisco Nexus or any other switch that meets VMware vSAN requirements |
Maximum Node per Cluster | 64 |
Maximum Nodes Manageable per VMware vCenter | 2000 |
Minimum Initial Order | 2 node (minimum 4 nodes for Intel Select Solutions*) |
Node Increment | 1 node |
EVERFLEX FROM HITACHI
Choose from purchase, lease and cloud-like pay-per-use consumption with EverFlex.
How do you incorporate HCI into your existing infrastructure so that HCI does not become another silo?
WATCH THE WEBINARIntegrated software-defined data center and hybrid cloud infrastructure.
CLICK HEREPower secure borderless workspaces, anytime, anywhere with this virtual desktop infrastructure (VDI) solution.
CLICK HEREVirtualize your infrastructure to accelerate cloud, reduce complexity, speed innovation and seize new opportunities.
CLICK HERESupport any application at any scale with a dynamic and reliable converged infrastructure.
CLICK HEREUse modern data protection techniques to simplify processes and easily meet data availability service-level requirements.
CLICK HERE