FIXED COST
& MATERIAL
FIXED COST
Project-based/ Fixed Cost is one of three collaboration models in HVN. With this model, scope of work and project cost are determined at the beginning of the project.
The project is fully controlled by HVN management and follows HVN software development processes. HVN delivers work products to the client at every milestone.
& MATERIAL
The hybrid collaboration model is a mixed model of Project-based and ODC.
When the scope of work is difficult to estimate the project size/ cost, HVN can provide the ODC collaboration model to the client and then switch to the project-based/ fixed cost model.

PROJECT-BASED FIXED COST
Project-based/ Fixed Cost is one of three collaboration models in GCS. With this model, scope of work and project cost are determined at the beginning of the project.
The project is fully controlled by GCS management and follows GCS software development processes. GCS delivers work products to the client at every milestone.
ODC/ TIME & MATERIAL
HYBRID COLLABORATION
The hybrid collaboration model is a mixed model of Project-based and ODC.
When the scope of work is difficult to estimate the project size/ cost, GCS can provide the ODC collaboration model to the client and then switch to the project-based/ fixed cost model.